Site Work & Utilities

Commercial and utility diagnostics — storm drainage, lift stations, water supply, fire suppression, and sewer.

Storm Drainage

Storm drains, catch basins, and yard drainage that won't move water.

  • Clogged grates and catch basins
  • Standing water and grading issues
  • French drain and daylight outlet checks
Start diagnosis

Lift Stations

Sewage lift and grinder pump stations — alarms, floats, and control panels.

  • Alarm / high-level diagnosis
  • Pump, float, and check valve testing
  • Safe breaker and panel checks
Start diagnosis

Water Supply

Building water pressure, main lines, pressure tanks, and backflow preventers.

  • Whole-building pressure loss
  • Main line and PRV checks
  • Leak signs and valve audits
Start diagnosis

Fire Suppression

Sprinkler and suppression systems — impairments, leaks, and inspections.

  • Impairment procedure (tag-out + AHJ)
  • Active leak and damage response
  • NFPA 25 inspection cadence
Start diagnosis

Sewer & Septic

Sewer backups, main line vs branch clogs, and cleanout checks.

  • Multiple-fixture backup triage
  • Cleanout level checks
  • When to stop using water
Start diagnosis

Pipe Slope & Gradient

Set the outlet elevation from your run length and inlet invert height.

Total fall

0.52 ft

(6.2 in)

Outlet invert elevation

99.48 ft

trench target depth

Gradient

1.04%

(0.125 in per ft)

Check

Below common minimum — steepen

Measure elevations from the pipe invert (bottom inside of the pipe), not the top. Too little slope clogs; too much (over ~3%) makes liquids outrun solids in sewer lines. Always confirm minimum slopes with your local code office.

Pipe Size & Flow Capacity Chart

Approximate full-flow gravity capacity at a 1% slope (smooth-wall pipe).

SizeTypical site useCommon materialsFull flow (GPM)
1 1/2"Fixture drains, AC condensatePVC, CPVC, copper~5
2"Small fixture branches, area drainsPVC, ABS, CPVC~15
3"Toilet branches, small floor drainsPVC, ABS, cast iron~40
4"Building drains, sewer laterals, downspoutsPVC, ABS, cast iron~85
6"Storm mains, small sewer mainsPVC, HDPE, concrete~250
8"Storm / sewer mains, fire linesPVC C900, HDPE, RCP, ductile iron~540
10"Culverts, large storm mainsRCP, HDPE, PVC~980
12"Culverts, trunk storm linesRCP, HDPE, CMP~1,600

Halve the slope and capacity drops about 30%. Sewer lines also carry a max — over ~3% slope liquids outrun solids.

Pipe Materials Guide

Match material to job — soil, load, temperature, and code.

PVC (Sch. 40 / DWV)

Building drains, laterals, storm lines

Cheap, smooth (low friction), glue-jointed. Brittle in cold and UV-degrades above ground.

CPVC

Hot and cold potable water

Handles hot water where PVC can't. Check pressure rating at temperature.

ABS

Residential DWV, exterior drain lines

Handles cold better than PVC; one-step solvent cement; can sun-fade.

HDPE (corrugated / smooth)

Storm drainage, culverts, directionally drilled lines

Flexible, fusion-welded joints, great under settling ground. Needs proper bedding.

Ductile iron

Water mains, fire lines, force mains

High pressure and impact strength; the standard for municipal supply and hydrant feeds.

Reinforced concrete (RCP)

Storm sewers, large culverts, heavy traffic loads

Handles big diameters and live loads; joints need gaskets/mortar, heavy to set.

Galvanized / corrugated metal

Driveway culverts, ditch crossings

Strong and cheap; rusts in acidic or salty soils — check coating (polymer/asphalt).

Site and utility work carries extra hazards: confined spaces (never enter a wet well), sewage exposure, and fire-system code requirements. When a wizard says call a pro — for lift stations, mains, and fire suppression especially — it means it.